Affiliate disclosure: we may earn a commission when you buy through our links. Read how this works

Software & Technology review

Method Statement Template (worldofpm) review

An editable Word and Excel method statement template for site work, covering methodology, resources, quality and HSE, $3.90 with the page coupon.

Worth it

A cheap, clearly scoped template with a 60-day refund window, and the page coupon worked on the form. The seller identity rests on an author credit in the form copy and an imprint we could not read. No sample or page count, but at under $4 the downside is small.

Price
$3.90
Billing
One-time payment
Best for
Construction professionals, engineers and students who need a method statement outline
Not for
Anyone expecting construction software or a statement written for their site

Method Statement Template (worldofpm) at a glance

World of Project Management sells one method statement template for documenting how site or construction work will be carried out. The page lists preparation, execution and follow-up steps, roles, materials and equipment, quality control and health and safety. Files are Word and Excel; the order form credits Marc Arnecke, PMP.

Format
Editable Word and Excel files, instant digital delivery
Scope
Work methodology, responsibilities, materials and equipment, quality control, HSE
Price
$3.90 with the coupon Discount_73_10; $16.23 without it (including 8.25% sales tax)
Refund window
60 days on the order form
Seller
World of Project Management, worldofpm.com; the order form credits Marc Arnecke, PMP (ARMACO); the linked imprint page did not load for us
Digistore24 ID
385202

One template, clear scope

Page and form describe the same editable method statement covering methodology, responsibilities, quality and HSE; no page count or sample.

For offer clarity we give 7.0.

The coupon does the work

The page shows $14.99 struck through and $3.60; the form opens at $16.23 and drops to $3.90 with the button coupon Discount_73_10, the rest being sales tax.

For pricing honesty we give 7.0.

Sixty days

The form states a 60-day refund window.

For refund terms we give 8.0.

Trading name plus author credit

World of Project Management signs the site; the form names Marc Arnecke, PMP (ARMACO); the imprint did not load.

For vendor transparency we give 5.0.

Pros and cons

What works

  • Under $4 with the page coupon
  • Clear list of sections
  • 60-day refund window

What does not

  • No file preview
  • Sales tax added on the form
  • Imprint not retrievable

Method Statement Template (worldofpm) FAQ

What does it cost?

$3.90 including sales tax with the Buy button coupon; $16.23 without it.

Is there a refund window?

Yes, 60 days on the order form.

Who sells it?

World of Project Management (worldofpm.com); the order form credits Marc Arnecke, PMP.

What do I receive?

One editable Word and Excel method statement template, delivered digitally.

The bottom line

A cheap, clearly scoped template with a 60-day refund window, and the page coupon worked on the form. The seller identity rests on an author credit in the form copy and an imprint we could not read. No sample or page count, but at under $4 the downside is small.

Open the Method Statement Template (worldofpm) offer Compare Software & Tech products